23 November 2006
9th CEI
Summit Economic Forum in Tirana
1
CEI Summit Economic
Forum 2006
IBA
05
00he Contractor00 View on
Quality
Procurement00/b>
Gian Alfonso Borromeo
(EIC President)
23 November 2006
9th CEI
Summit Economic Forum in Tirana
2
Part II: EIC Position on Procurement
Part III: Conclusion
Structure of the Presentation
23 November 2006
9th CEI
Summit Economic Forum in Tirana
3
1 - Basic Facts about
EIC
Structure
23 November 2006
9th CEI
Summit Economic Forum in Tirana
4
1 - Basic Facts about
EIC:
Board Members
(President), Astaldi (I) Johan Beerlandt
(VP), Besix (B) Lefty Panayiotou
(Treasurer) Costain Int. (U.K.) Thomas Alm
SKANSKA (S) Michel D茅marre
Colas (F)
Ebbe Malte Iversen
Per Aarsleff (DK) Norbert Hoffmann
Bilfinger Berger (D) Alcib铆ades L贸pez Cer贸n
FCC (E) Antonio Mota
Mota-Engil (P) Gerrit Witzel
Strukton Groep (NL)
23 November 2006
9th CEI
Summit Economic Forum in Tirana
5
1 - Basic Facts about
EIC:
Institutional Contacts
23 November 2006
9th CEI
Summit Economic Forum in Tirana
6
1 - Basic Facts about
EIC:
Goals
Fair Market Balanced contract conditions Effective Dispute Settlement International Arbitration
Ethical Market Corruption-free environment Environmentally sustainable projects
23 November 2006
9th CEI
Summit Economic Forum in Tirana
7
1 - Basic Facts about
EIC:
International Statistics 2005
With an aggregated international turnover in 2005 of over 100 billion 00 European international contractors are still the most important players in the international construction business.
23 November 2006
9th CEI
Summit Economic Forum in Tirana
8
2 00EIC Position on
Procurement:
Trend Analysis on supply side
(00ll business is formally local00/b>).
Source: EIC
23 November 2006
9th CEI
Summit Economic Forum in Tirana
9
2 00EIC Position on
Procurement:
Trend Analysis on demand side
23 November 2006
9th CEI
Summit Economic Forum in Tirana
10
2 00EIC Position on
Procurement:
European Court of
Auditors Special Report (8/2003)
23 November 2006
9th CEI
Summit Economic Forum in Tirana
11
2 00EIC Position on
Procurement:
Full-scale MDB control of the project cycle
Project
Approach
Effective
Dispute
Resolution
Fair
Contract
Conditions
Innovative
Forms
of
Procurement
Sizeable
Projects
Quality
Studies
Virtuous circle of Quality Procurement
23 November 2006
9th CEI
Summit Economic Forum in Tirana
12
2 00EIC Position on
Procurement
EIC Guides on FIDIC contract forms
To assist its
member companies, EIC Contractor00 Guides on the FIDIC 1999 00ew
Books00were produced between 2000 and 2002 and all published in the
leading magazine (ICLR).
EIC
Blue Book on 00ustainable Procurement00was published in 2004
EIC will publish in early 2007 a Contractor00 Guide to the 2006 MDB Harmonised Edition (FIDIC New Red Book)
23 November 2006
9th CEI
Summit Economic Forum in Tirana
13
2 00EIC Position on
Procurement
EIC Comments on FIDIC documents
re-allocate the construction risks (as, regrettably, it is often the case). Since translation are sometimes incorrect, FIDIC should take due responsibility to provide official versions of translated standard documents. The Conditions of Contract should contain binding Dispute Boards and a mandatory International Arbitration clause. EIC welcomes the fact that FIDIC is about to publish a DBO form of contract.
23 November 2006
9th CEI
Summit Economic Forum in Tirana
14
3 - Conclusion
EIC
strongly suggests that the European financial institutions (EBRD, but
also EuropeAid) enter into a structured dialogue with the international
contractors (represented by EIC) and the international consultants (represented
by FIDIC and EFCA) to discuss the possibilities of introducing Quality-Based
Procurement in the field of infrastructure works.
EIC is more than ready to share the expertise of its member companies in the course of such a process.
23 November 2006
9th CEI
Summit Economic Forum in Tirana
15
EIC Contact
Kurfuerstenstrasse 129,
D - 10785 Berlin, Germany
Phone: ++49 (0)30 /21286-244
Fax: ++49 (0)30 /21286-285
E-mail: eicontractors@compuserve.com
Internet: www.eicontractors.de