USDA NRCS REQUEST FOR SOILS INFORMATION
Natural Resources Conservation Service 00/font> Bozeman Field Office, 3710 Fallon Street, #B 00/font> Bozeman MT 59718 00/font> Phone 522-4000 ext. 3 00/font> Fax 585-1272
NAME: ORGANIZATION:
COMPLETE ADDRESS:
PHONE NUMBER: TODAYS DATE: LEGAL DESCRIPTION (required) or MAPUNITS:REPORT TYPE (please check the following reports that you need):
00/b> MANU 00Soil Map Legend
Mapunit Symbol and Soil Name
00/b> MANU 00Table AWM-1: Agricultural Waste Management
Application of Manure and Food-Processing Waste
Application of Sewage Sludge
Disposal of Wastewater by Irrigation00/b> MANU 00Table AWM-2: Agricultural Waste Management
Overland Flow of Wastewater
Rapid Infiltration of Wastewater
Slow Rate Treatment of Wastewater
00/b> MANU 00Table B: Land Capability and Yields per Acre of Crops and Pasture (Non-Irrigated and Irrigated Values)
Land Capability Class
Alfalfa Hay Production (Tons/Acre)
Grass Hay Production (Tons/Acre)
Pasture Production (AUMs)
00/b> MT - Modeled Spring and Winter Wheat Yields
Spring Wheat Production (Bushels/Acre)
Winter Wheat Production (Bushels/Acre)
00/b> MT - Modeled Barley and Oat YieldsBarley Production (Bushels/Acre)
Oats Production (Bushels/Acre)
00/b> MANU 00Table C2: Rangeland Productivity and Characteristic Plant Communities
Ecological Site Description
Total Dry-Weight Production (Favorable, Normal, and Unfavorable years)
Characteristic Vegetation
00/b> MANU 00Table E1: Forest Productivity
Potential Productivity
Common Trees
Site Index
Volume of Wood Fiber (Cubic Feet/Acres)
Trees to Manage
00/b> MANU 00Table ENG-1. Construction Materials
Potential Source of Gravel
Potential Source of Sand
00/b> MANU 00Table ENG-2. Construction Materials
Potential Source of Reclamation Material
Potential Source of Roadfill
Potential Source of Topsoil
00/b> MANU - Table ENG-3: Building Site DevelopmentDwellings without Basements
Dwellings with Basements
Small Commercial Buildings
00/b> MANU - Table ENG-4: Building Site DevelopmentLocal Roads and Streets
Shallow Excavations
Lawns and Landscaping
00/b> MANU - Table ENG-5: Sanitary FacilitiesSeptic Tank Absorption Fields
Sewage Lagoons
00/b> MANU - Table ENG-6: Sanitary Facilities Trench Sanitary LandfillArea Sanitary Landfill
Daily Cover for Landfill
00/b> MT 00Sprinkler Irrigation and FencingSprinkler Irrigation
Fence Post Installation
00/b> MANU - Table H: Engineering PropertiesUSDA Texture
Unified and AASHTO Classifications
Percent Coarse Fragments
Percent Passing Sieve Number
Liquid Limit
Plasticity Index
00/b> MANU - Table J1b: Physical PropertiesPercent Sand, Silt, and Clay
Moist Bulk Density
Permeability (Ksat) (Inches/Hour)
Available Water Capacity
Linear Extensibility
Erosion Factors (Kw, Kf, and T)
Wind Erodibility Group
Wind Erodibility Index
00/b> MANU - Table J1: Chemical PropertiesCation Exchange Capacity
Effective Cation Exchange Capacity
Soil Reaction
Calcium Carbonate
Gypsum
Salinity
Sodium Adsorption Ratio 00/b> MANU - Table K1: Water FeaturesHydrologic Group
Month
Water Table
Ponding Duration and Frequency
Flooding Duration and Frequency
00/b> MANU - Table K2: Soil FeaturesRestrictive Layer
Subsidence
Potential for Frost Action
Risk of Corrosion (Uncoated Steel and Concrete)
00/b> MANU - Table Q1: Classification 00/b> MANU - Table REC-1: RecreationCamp Areas
Picnic Areas
Playgrounds
00/b> MANU - Table REC-2: RecreationPaths and Trails
Off-Road Motorcycle Trails
Golf Fairways
00/b> MANU 00Table U. Windbreak PlantingsSuitability of different trees by predicted 20-year average height
00/b> MANU 00Table Y. Prime Farmland 00/b> Hydric Soils List ComponentHydric (Yes or No)
Local Landform
Hydric Soils Criteria
Acres
00/b> Non-Technical DescriptionsI understand that the requested map and associated information are to be used as a primary reference source and are not intended for use in site-specific planning. This is public information and may be interpreted by organizations, agencies, units of government, or others based on needs; however, they are responsible for the appropriate application. Federal, state, or local regulatory bodies are not to reassign to the USDA Natural Resources Conservation Service (NRCS) any authority for the decisions made.
Signature: Date:
We will process your request as soon as possible, but please allow up to two weeks to do so. We will contact you immediately when your soils report is ready. You may pick up the report or we can mail it to you. Please circle one:
PICK UP MAIL
A DETAILED LOCATION MAP MUST ACCOMPANY YOUR REQUEST FORM
